|
The Crescent (2000 - 2004)
Between 2000 and 2004 I had the opportunity to produce a number of audio-visual installations for the Crescent, Buxton, Derbyshire with the aim of bringing a sense of life and occupancy back to this once grand but now derilict building.
Scroll along to view snapshots from an initial visit to the derelict building on February 10th 2000.
Click HERE to view the installations:
|
|
St Annes Hotel - Gas Fire |
St Annes Hotel - En-Suite Bathroom |
St Annes Hotel - Bedroom Fireplace (vandalised) |
St Annes Hotel - First Floor Corridor |
St Annes Hotel - First Floor Lounge (water-damaged)
|
St Annes Grill - Robot Coupe Bowl Cutter & lightshade |
St Annes - Psychedelic Mural, Grill Bar
|
St Annes Hotel - First Floor Dinning Room
|
Assembly Rooms - Telephone |
Assembly Rooms - Main Staircase |
St Annes Hotel - First Floor (back) En-Suite |
St Annes Hotel - Water Cistern (missing) |
St Annes Hotel - First Floor Bathroom |
Assembly Rooms - Ceiling Design |
|